Concrete column and Sonotube calculator
Four round piers 12 in across and 4 ft deep hold 12.57 cu ft (0.47 cubic yards) of concrete. With 10% extra that is 24 bags of 80 lb mix.
How it works
A round column is a cylinder: π × radius² × height. Enter the diameter of the hole or form tube and its height, and the number of identical columns. For a pier poured into a tube that sits in a hole, measure the tube's full length, including the part below ground.
π × (12 in ÷ 2)² × 4 ft × 4 = 12.57 cu ft
12.57 cu ft ÷ 27 = 0.47 cu yd
With 10% extra: 0.51 cu yd, or 24 bags of 80 lb mix
Concrete per foot of form tube
Multiply the figure for your tube size by its length in feet. The bag counts are per foot, so round up only once you have the total.
| Tube diameter | Cu ft per ft | 80 lb bags per ft | 60 lb bags per ft | Cu yd per 10 ft |
|---|---|---|---|---|
| 6 in | 0.196 | 0.33 | 0.44 | 0.07 |
| 8 in | 0.349 | 0.58 | 0.78 | 0.13 |
| 10 in | 0.545 | 0.91 | 1.21 | 0.20 |
| 12 in | 0.785 | 1.31 | 1.75 | 0.29 |
| 14 in | 1.069 | 1.78 | 2.38 | 0.40 |
| 16 in | 1.396 | 2.33 | 3.1 | 0.52 |
| 18 in | 1.767 | 2.95 | 3.93 | 0.65 |
| 20 in | 2.182 | 3.64 | 4.85 | 0.81 |
| 24 in | 3.142 | 5.24 | 6.98 | 1.16 |
Deck and porch piers, 4 ft deep
| Diameter | Cu ft per pier | 80 lb bags per pier | 60 lb bags per pier |
|---|---|---|---|
| 8 in | 1.4 | 3 | 4 |
| 10 in | 2.18 | 4 | 6 |
| 12 in | 3.14 | 6 | 8 |
| 14 in | 4.28 | 8 | 11 |
| 16 in | 5.59 | 11 | 14 |
Piers that hold up a structure must reach below the local frost line. QUIKRETE's post-setting guide says a structural post hole must extend at least 6 in below it. Your building department can tell you the frost depth and the pier size your deck needs.
Sources
- QUIKRETE Concrete Mix (No. 1101) data sheet, The QUIKRETE Companies, revised October 2022. Bag yields: 40 lb 0.30 cu ft, 50 lb 0.375, 60 lb 0.45, 80 lb 0.60, 90 lb 0.675; about 140 lb per cubic foot.
- Setting Posts (project sheet), The QUIKRETE Companies, current sheet. Hole 3 times the post diameter; depth one third of the post length plus 6 in of gravel; concrete to 3 to 4 in below the top; 6 in below the frost line for structural posts.
- CIP 8: Discrepancies in Yield (Concrete in Practice series), National Ready Mixed Concrete Association, 2016 edition. Order at least 4 to 10 percent more than the measured volume; 1/8 in extra on a 4 in slab is a 3 percent shortfall.